by Sandy Ryan | Jan 31, 2023
Site development and new construction of a 35’, three-story, 112,785sf climate controlled self-storage building totaling 803 units. The Pre-engineered metal building structure is completely conditioned, and fully fire sprinkled with new Stanley storefront auto...
by Sandy Ryan | Jan 4, 2023
After completing demolition of the existing bank building, Atlas provided complete site development and new construction of a 39′, 3-story, 93,777sf, self-storage facility with 723 storage units. The Pre-Engineered Metal Building structure is completely conditioned...
by Sandy Ryan | Apr 27, 2022
Atlas provided complete demo, site development and new construction of a 35’, three-story, 90,111 sf self-storage facility. It contains 660 storage units; one floor is at basement level and two are above ground. The Pre-Engineered Metal Building structure is...
by Sandy Ryan | Jul 12, 2021
Atlas provided complete site development and new construction of a 35′, 3-story, 94,163sf self-storage facility with almost 800 storage units. The Pre-Engineered Metal Building structure is completely conditioned and fully fire sprinkled. The facility includes a...
by Sandy Ryan | Jun 4, 2019
Atlas completed construction of a new, 3-story, 40’ high self-storage building and two additional single-story buildings totaling 88,000sf. Pre-construction design and bid phase services including plan review and submittals through permitting were also provided. The...