Atlas provided complete site development and new construction of a 35′, 3-story, 94,163sf self-storage facility with almost 800 storage units. The Pre-Engineered Metal Building structure is completely conditioned and fully fire sprinkled. The facility includes a...
Atlas recently completed construction of a new, 3-story, 40’ high self-storage building and two additional single-story buildings totaling 88,000sf. Atlas provided pre-construction design and bid phase services including plan review and submittals through permitting....
Atlas provided complete site development and construction, including renovation of an existing office building and new construction of a two- story, 50,000 sf storage building. The office renovation consisted of complete interior demolition including removing the...
Atlas completed full site development of 3.96ac parcel and new construction of a three-story, Pre-Engineered Metal structure, self-storage facility comprised of 72,900sf climate controlled and 1,650sf non-climate controlled units with a total of 600 units.
Atlas completed site work and new construction of a 41,000sf, three-story structure and retrofit renovations to a single-story 52,000sf, warehouse. The two buildings are fully conditioned with both interior and exterior access to the storage units. Frank G. Relf was...