by Sandy Ryan | Feb 2, 2023
Atlas was selected as the CM/GC after preparing the overall budget, suggesting value engineering options, and preparing the overall schedule for this project. The project scope consists of site development of a 5.4 acre site in Lakewood Ranch along with construction...
by Sandy Ryan | Jan 31, 2023
Atlas to complete site development and construction of a new three-story, 35’ tall, 104,877 SF self-storage facility with 819 units of varied sizes. The sitework includes new fill to bring the building to the proper elevation, a directional bore under Cattlemen road...
by Sandy Ryan | Jan 31, 2023
Site development and new construction of a 35’, three-story, 112,785sf climate controlled self-storage building totaling 803 units. The Pre-engineered metal building structure is completely conditioned, and fully fire sprinkled with new Stanley storefront auto...
by Sandy Ryan | Jan 4, 2023
After completing demolition of the existing bank building, Atlas provided complete site development and new construction of a 39′, 3-story, 93,777sf, self-storage facility with 723 storage units. The Pre-Engineered Metal Building structure is completely conditioned...
by frstsite | Dec 3, 2019
King Plastic Corporation selected Atlas to complete a new 106,000 sf expansion to their existing, state-of-the-art 150,000 sf plant located in the City of North Port. The addition, which features a steel structure and roof with concrete tilt wall panels, houses...