Atlas was selected as the construction manager/general contractor which included Preconstruction services of architect selection, introductions to banking relationships, design evaluation, constructability reviews, value engineering options, budget and schedule...
Atlas was selected as the CM/GC after preparing the overall budget, suggesting value engineering options, and preparing the overall schedule for this project. The project scope consists of site development of a 5.4 acre site in Lakewood Ranch along with construction...
Following demo work, Atlas is completing site development improvements, additions and new construction of a single-story, 45,576sf climate controlled self-storage building and the addition of four new out buildings for boat or RV storage. The primary Pre-engineered...
Site development and new construction of a 35’, three-story, 112,785sf climate controlled self-storage building totaling 803 units. The Pre-engineered metal building structure is completely conditioned, and fully fire sprinkled with new Stanley storefront auto...
After completing demolition of the existing bank building, Atlas is providing complete site development and new construction of a 39′, 3-story, 93,777sf, self-storage facility with 723 storage units. The Pre-Engineered Metal Building structure will be completely...