by Sandy Ryan | Feb 2, 2023
Atlas was selected as the CM/GC after preparing the overall budget, suggesting value engineering options, and preparing the overall schedule for this project. The project scope consists of site development of a 5.4 acre site in Lakewood Ranch along with construction...
by Sandy Ryan | Jan 31, 2023
Atlas to complete site development and construction of a new three-story, 35’ tall, 104,877 SF self-storage facility with 819 units of varied sizes. The sitework includes new fill to bring the building to the proper elevation, a directional bore under Cattlemen road...
by Sandy Ryan | Jan 31, 2023
Site development and new construction of a 35’, three-story, 112,785sf climate controlled self-storage building totaling 803 units. The Pre-engineered metal building structure is completely conditioned, and fully fire sprinkled with new Stanley storefront auto...
by Sandy Ryan | Jan 4, 2023
After completing demolition of the existing bank building, Atlas provided complete site development and new construction of a 39′, 3-story, 93,777sf, self-storage facility with 723 storage units. The Pre-Engineered Metal Building structure is completely conditioned...
by Sandy Ryan | Jun 10, 2022
Atlas completed a full renovation of an existing 12,000s.f. airport hangar at Kissimmee Gateway Airport including all new mechanical, electrical, and plumbing. The project included reconfiguration and renovation of the offices, guest lounge, bathrooms, and break room...