Lock Up Self-Storage Nokomis

Image Slide
Lock Up Nokomis 2023-09-11 (1)
Lock Up Nokomis 2023-09-11 (1)
Lock Up Nokomis 2023-08-04
Lock Up Nokomis 2023-08-04
Lock Up Nokomis 2023-09-11 (2)
Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
YouTube Slide
PlayPlay
Lock Up Nokomis 2023-06-30 (1)
Lock Up Nokomis 2023-06-30 (2)
Lock Up Nokomis 2023-06-30 (3)
Lock Up Nokomis 2023-09-11 (2)
previous arrow
next arrow
Image Slide
Lock Up Nokomis 2023-09-11 (1)
Lock Up Nokomis 2023-09-11 (1)
Lock Up Nokomis 2023-08-04
Lock Up Nokomis 2023-08-04
Lock Up Nokomis 2023-09-11 (2)
Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
YouTube Slide
Lock Up Nokomis 2023-06-30 (1)
Lock Up Nokomis 2023-06-30 (2)
Lock Up Nokomis 2023-06-30 (3)
Lock Up Nokomis 2023-09-11 (2)
previous arrow
next arrow

Architect/Engineer

Partners in Design Architects, Inc.

Location

Nokomis, FL

Project Size

112,785 sf

Project Details

Site development and new construction of a 35’, three-story, 112,785sf climate controlled self-storage building totaling 803 units.

The Pre-engineered metal building structure is completely conditioned, and fully fire sprinkled with new Stanley storefront auto operated doors and covered unloading areas. The site development includes preparations for a phase 2 area adjacent to the new storage facility to be developed at a later date.