GT Bray Football & Soccer Improvements

Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
previous arrow
next arrow
Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
Image Slide
previous arrow
next arrow

Architect/Engineer

Fleischman Garcia Architecture

Location

Bradenton, FL

Project Size

Project Details

Atlas completed Preconstruction services in developing the final GMP for this project consisting of two separate, adjacent facilities and provided construction management on the demolition and construction.

The football building was demolished, newly constructed and includes (2) structures. One is a two-story building to house the concessions, storage and press box and the other is a one-story structure to house the new restrooms and a large meeting area. Both structures are tied together with a louvered breezeway. A new, pre-engineered aluminum canopy provides cover to a patio and seating area.

The existing soccer building had selective demo to make way for new renovations and a new structure built to house a concession area. The renovated building will house restrooms, offices and meeting space. A covered breezeway ties the 2 structures together and a large pre-engineered aluminum canopy cover the seating and patio area.

Site work included the addition of new sidewalks and stormwater drainage systems to both facilities.